Integration Setup for Primavera
Explanation
This activity is used to enter necessary data to be able to set up 
integration configurations for the integration between IFS Applications and 
Primavera Project Management module (Primavera). The configurations can be used 
for exports and imports of data from IFS/Project to Primavera.
The data entered in the Integration 
Setup/Integration Database Setup 
tab is used to log into the Primavera database during the integration. The setup 
for calendars and resources is optional and can be done according to the 
requirement for calendars and resources that are to be included in the 
integration.
Calendars can only be exported through the integration and the 
Integration Setup/Integration Calendar Setup 
tab is used to define the IFS/Project calendars and its schedules. Resources can 
be both exported and imported through the integration. The data in the 
Integration Setup/Integration Resource 
Setup tab is used to setup the mandatory data (cost element and calendar) to be 
able to import resources to IFS/Project.
Prerequisites
	- The Primavera Project Management module should be installed.
System Effects
	- The integration configuration record can be used for both basic data 
	integrations and project data integrations. 
Window
Integration Setup
Related Window Descriptions
Integration Setup/Integration Database 
Setup
Integration Setup/Integration Calendar 
Setup
Integration Setup/Integration Resource 
Setup
Procedure
Integration Setup:
	- Open the Integration Setup/Integration Database Setup tab.
- If a suitable integration setup does not exist, create a new 
	integration setup record.
- Enter a value in the Setup ID field.
- Select a value in the External Planning Tool field.
- Enter valid values in the External Planning Tool Database, 
	External Planning Tool User ID, External Planning Tool Password, 
	External Planning Tool
 Integration API Host, External Planning Tool Integration API Port  
	and External Planning Tool Time Zone 
	fields. The values in these fields will be used to log into Primavera during 
	the export.
- Save the integration setup record.
Calendar Setup:
	- Open the Integration Setup/Integration Calendar 
	Setup tab.
- If a suitable setup for the required calendar ID does not already exist, 
	create a new record.
- Select a value in the Calendar ID field.
- Select a value in the Base Schedule field.
- Optionally, enter dates in the From Date and To Date 
	fields for the secondary schedule of the calendar to be applied.
- Save the calendar setup record.
Resource Setup:
	- Open the Integration Setup/Integration Resource Setup tab.
- If a suitable setup for the required resource company does not already 
	exist, create a new record.
- Select a value in the Resource Company field.
- Select a value in the Default Cost Element field.
- Select a value in the Default Calendar field.
- Save the resource setup record.