Confirm Risk Analysis 
Explanation
This activity is used to signal the completion of the analysis on the risk 
record and to change its status to reflect this 
completion. 
Prerequisites
A risk analysis ID must exist with Analysis in Progress status.
System Effects
	- The Status Analyzed is assigned to the risk analysis.
- On confirmation, the risk analysis is automatically assigned a Last 
	Assessment Date and the Next Assessment Date is calculated and 
	displayed, based on the review period defined. 
- The risk analysis Revision number increases by one.
- The risk analysis history record is inserted into the risk cost exposure records 
	on the 
	Risk Cost Exposure Tracking window. 
Window
Risk Analysis Navigator
Risk Analysis 
Details
Risk Cost 
Exposure Tracking 
Related Window Descriptions
Risk Analysis Navigator
Risk Analysis Details
Risk Cost Exposure Tracking/Exposure 
per Revision
Procedure
Use the following procedure to change the status of the risk analysis to 
Analyzed and view the related effects:
	- Open the 
	Risk Analysis Navigator or 
	Risk Analysis Details 
	window and query(F3) for the required risk analysis.
- Right click, click Status and then click Confirm Analysis. 
	The status of the risk analysis will change to Analyzed. 
- Click Save (F12).
- Open the 
	Risk Cost Exposure Tracking window and query for 
	the risk analysis that you confirmed. View the record which shows the total 
	risk cost exposure per revision to determine if the actions taken have 
	reduced the risk cost exposure.