Define Risk Project Types 
Explanation
This 
activity is used to define the types of risk projects which may be analysed within the risk 
analysis. The purpose of risk project types is to 
restrict the 
analysis categories and to group similar risk analyzes so that 
information registered to such IDs are easy to find and copy to another risk 
analysis ID of the same risk project type.
Prerequisites
None
System Effects
	- Creates a risk project type record which will be made available in a List of 
	Values for connection to risk analysis IDs to group similar IDs.
- Analysis categories are based on risk project types and only those 
	risk project 
	types that exist can be defined on a particular analysis category.
Window
Risk Basic 
Data
Related Window Descriptions
Risk Basic Data/Risk Project Types
Procedure
Use the following procedure to create a Risk Project Type:
	- Open the Risk Basic Data window, and select the 
	Risk Project Types tab.
- Click New (F5) to 
	create a new record. A default value for Risk Project Type ID field is 
	assigned for the new record which can be edited if required. 
	
- In the Risk Project Type Description field, enter the description of 
	the Risk Project Type.
- Click Save.