Revise Risk Analysis
Explanation
This activity is used to peruse through the entire risk structure and assess the need 
for any revisions to be made. It is also important at this juncture to change 
the status on the parent consequence record to reflect the effect on the 
consequence once the mitigating actions have been performed. 
Prerequisites
The risk analysis should have the Status Analysis in Progress.
System Effects
None
Window
Risk Analysis Navigator
Risk Consequences
Risk Consequence 
Related Window Descriptions
Risk Analysis Navigator/Consequence List
Procedure
Use the following procedure to change the status on a consequence: 
	- Open the Risk Analysis Navigator window and select the 
	
	Consequence List tab, or open either the 
	Risk Consequences 
	or Risk Consequence 
	windows.
 
 Note: If you use the 
	Consequence List tab on the 
	Risk Analysis Navigator 
	window, navigate to and select the problem node for the selected risk 
	analysis to change the status on a consequence. When using the 
	Risk Consequences or 
	Risk Consequence 
	window, query (F3) and click List in the Risk Analysis ID and
	Problem ID fields, and select the required risk analysis and problem 
	record. Next select OK to display the consequence record to be 
	modified.
 
- In the Status field, select a status from the drop down list that 
	reflects the state of the consequence.
- Click Save.