Perform Due Calculation for LLP Tasks
Explanation
This activity is used to perform the due calculation for LLP tasks for a 
given serial. The calculation will be done for the serial, based on the 
registered average operational value per month and the life limited information 
defined for the serial. In addition, the due calculation will calculate the 
remaining life and drop-dead date and create a LLP task for the given serial, 
provided the serial part number is defined as a life limited part and it has 
reached the days of the forewarning period. 
Apart from manually performing the due calculation for a serial (as described in 
this activity), scheduled tasks exist to automatically calculate due dates for 
all life limited serials. The Life Limited Part Calculation scheduled task will 
be used to calculate the life limit of all serials defined as life limited 
parts. For more information on the scheduled tasks, refer to the activity 
Adjust and Verify Background Job for Calculations of LLP Tasks.
 
Prerequisites
	- An average operational value (per month) for the serial must exist. 
	
- For life limited parts to be calculated, life limited information must 
	be defined for the serial. 
	
- The serial available for due calculation, cannot have an operational 
	status of Planned for Operation and cannot be a locked serial.  
	
- The LLP tasks that are in a planning state 
	(i.e., in the Planned in Scope, Incomplete or Under 
	Preparation status) must be connected to a maintenance order that is not 
	yet released. 
	
System Effects
	- When the serial part number is defined as a life limited part (LLP) and 
	the due date calculated is within the defined number of days forewarning, 
	the calculation creates a maintenance task for the serial. 
	
- The due calculation for LLP tasks will handle 
	tasks that are included on maintenance orders not yet released.
Window
Serial Maintenance 
Task Summary 
Change Work Scope Tasks
Related Window Descriptions
Serial Maintenance
Serial Maintenance/Life Limited Serials
Task Summary
Task Summary/LLPs
Change Work Scope Tasks
Change Work Scope Tasks/LLPs
Procedure
Use the following procedure to run the due calculation for LLP tasks for a 
serial.
	- Open the Serial Maintenance window. 
- Query (F3) for the serial for which you will run the task calculation. 
	
- Right-click anywhere in the header of the window and then click 
	Perform Due Calculation to open the Perform Due Calculation 
	dialog box.
- Select the LLP Calculation check box to calculate LLP tasks. 
	
- If you want to perform task calculation for all serials in the serial 
	structure, select the Calculate Entire Structure check box. 
- To perform the task calculation as a background job, select the Run 
	in Background check box. 
- Click OK. 
	- When the task calculation is finished, you can view the calculated drop 
	dead date for the serial in the Life Limited Serials tab of 
	the Serial Maintenance window. 
If IFS/Complex MRO is used, the following procedure can be used to calculate 
due dates for the LLP tasks which are to be performed during a shop visit:
	- Open the Task Summary window or the Change Work 
	Scope Tasks window and query (F3) for the overhaul object and/or the 
	MRO work order number you want. 
- Right-click anywhere in the header, and then click Perform Due 
	Calculation. 
- The calculated due dates can be viewed in the 
	LLPs tab found in the Task Summary window and in 
	the Change Work Scope Tasks window.