Enter PM Settings
Explanation
Use this activity to create and connect separate PM 
actions per service line.
Prerequisites
	- Service lines should exist in Service 
Contract/Services. 
- Actions and maintenance organizations should be 
	entered in IFS/Basic Data for Maintenance. Ideally a work time calendar 
	should be connected to the maintenance organization.
System Effects
As a result of this activity a new PM action will be 
created and connected to the service line. If the PM actions are calendar based, 
a maintenance plan will be generated and displayed on the 
Service 
Contract/PM Maintenance Plan tab.
Window
Service Contract 
Related Window Descriptions
Service Contract 
Service Contract/PM Settings
Procedure
	- Open the 
	Service Contract window and 
	query for an active service contract (F3).
- Click the  PM Settings tab and create a new record 
	(F5).
- Enter the service line number that you want to 
	connect the PM action to in the  Line No field. Use the List of Values to 
	select a suitable value.  Note: When you enter a line number the following 
	fields will be populated with the values from the service line:  Object
      Site,  
	Object ID,  Work Type,  Valid From as well as  Maint.
      Org. and  Valid To (if 
	entered on the Services tab). Note: The valid time 
	period of the PM action should not  fall outside the valid time period of the 
	service line.
- Enter a value in the  Action Code field by using the List 
	of Values.
- If you want a maintenance plan generated, (work 
	order generation = Calendar Generation) include values in the Start Unit,
	Start Value, Interval Unit and Interval Value fields. 
	For event generation enter values in the Event,  Start Event and
       Event 
	Interval fields.
- Additionally enter values in the remaining fields 
	as per your requirement.
- Save the information (F12).
- Right-click the row, point to  PM Action Status 
	and click  Active to activate the PM action.