Approve Status Change
Explanation
This activity is used to approve a status change of a sub contract. It may be necessary to 
approve a sub contract to verify its scope. To be able to do this, an approval 
for a status change must 
first be defined  in 
the Sub Contract/Approvals tab. 
Once you have entered a new approval on the sub contract, click the  
Attachments panel to enter approval steps and then to select the approval 
routings you have previously created. 
Once an approval has been approved it will not be possible to add new 
approval steps. If a new approval step is required, you need to first reject the 
approval, by right-clicking and clicking Reject Approval, before you can 
add new approval steps. 
Prerequisites
  - A sub contract must exist.
- An approval line must have been defined in the Approvals tab for the sub 
	contract. The Contract Approval Status for this approval line has been set 
	to the status you want to approve i.e. Released, Submitted, Awarded, Under 
	Review, Active, Completed or Closed.
- An approval routing may or may not be connected to the approval line 
	above.
- Document Management must have been installed.
System Effects
	- The status is changed for the sub contract.
Window
Sub Contract
Related Window Descriptions
Sub Contract/Approvals
Procedure
  - Open the 
	Sub Contract window and query (F3) for the 
	required sub contract.
- Click the Approvals tab and select the record to approve.
- Click the  Attachments panel. You will be able to see the 
	available approval routings if an approval routing is connected to the 
	approval record.
- Follow the steps described in the activity
	
	Approve Approval Step to approve all the steps.
- Once all steps have been approved, go back to the approval 
	in the Approvals tab, right-click and then click
	Approve.