Activate Broadcast
Explanation
This activity is used to activate a scheduling broadcast for the 
selected company. 
Prerequisites
To perform this activity, the scheduling broadcast must 
have been defined.
System Effects
	- The Active check box is selected for the 
	broadcast.
- The scheduling activities which are transferred to 
	the Scheduling Engine for scheduling will be broadcast back to IFS 
	Applications as scheduled plans.
Window
Scheduling Broadcast
Related Window Descriptions
Scheduling Broadcast 
Procedure
	- Open the Scheduling Broadcast 
	window.
- Verify that the correct company is in use. If not, 
	right-click and click Change Company to change the company.
- Populate (F2) or query (F3) for the necessary 
	broadcast.
- Select the Active check box.
- Save the information (F12).