Add Result to Work Order
Explanation
Use this activity to add the details of a single search
result line to a work order of your choice. You can also modify existing
operations and tool-and-facility lines of a work order, provided that the search is
invoked from the work order (the 
Prepare Work Order  window).
If you perform a combined free time search, you can connect the operation
lines to the tool-and-facility lines included in the search result. The
connection can also be made if the work order to which the tool-and-facility is
to be included contains an operation line (applicable for a Simple Free Time
Search).
Prerequisites
  - The work order to which you want the details to be added,
should be defined in the system.
- If you want to modify operations and tool-and-facility lines of an existing work order, the search should be invoked from
    the work order and the number of planned men on the operation line should
    not exceed one.
System Effects
  - If you selected Add to Work Order from the
    right mouse button options, the details of the
resources belonging to the result line will be added to the specified work order,
    as a new operation or tool and facility lines.
- If you selected Modify Work Order from the
    right mouse button options, the
    existing operation and tool-and-facility lines of the work order will be
    modified according to the details of the result line.
- If you chose to connect an operation to a tool-and-facility, the tool-and-facility line of the work order will contain the
    operation number that is connected to it. 
Window
Free
Time Search
Related Window Descriptions
Free Time Search
Free Time Search/Results 
Add to Work Order
 
Connect Tools
and Facilities to Operations
Procedure
To add results to a work order:
  - Open the 
	Free Time Search window.
- Perform a simple free time search or a combined free
    time search.
- Click the 
	Results tab.
- Select the appropriate record from the upper table.
    The details will be displayed in the lower table.
- Right-click on the selected row and then click Add To
    Work Order. The 
	Add To Work Order dialog box opens.
- Enter the work order number to which the resource
    details should be added. Click List to select a suitable value.
- Click OK.
- If the search
    criteria includes both an employee and a tool-and-facility, or if an operation
    line exists in the work order to which you want to add the tool-and-facility, the 
	
	Connect Tools and Facilities to Operations dialog box appears.
 Enter a value in the Operation
    No. field if you want to make a connection. Click List to select
    a suitable value.
- Click OK.
To modify existing operation and tool-and-facility
lines:
  - Open the 
	Prepare Work Order window, and
    click the  
	Operations tab or the 
	Tools and Facilities tab.
- Select a record. Right-click and then click Search
    Engine. The 
	Free Time Search Window opens.
- Perform a simple free time search.
- Click the 
	Results tab.
- Select the appropriate record from the upper table.
    The details will be displayed in the lower table.
- Right-click on the selected row and then click Modify
    Work Order.