Clock Out of an Operation
Explanation
This activity is used to clock out of an operation on 
the work order. When the Clock In/Clock Out feature is used, time reporting on 
an operation is done automatically.
When you clock out of an operation, the effective hours 
between clock in and clock out will be calculated and transferred as a time 
report line to the work order (in the Time Report tab). If a time 
report line already exists for your employee ID for that day, the work hours 
spent per clocking will be added to the current value in the Hours field.
Note: If you have clocked in to multiple 
operations at the same time, you will be clocked out from all these operations 
when clocking out.
Prerequisites
To perform this activity, you must be clocked in to the 
operation.
System Effects
	- The date and time you clocked out of the operation 
	is logged in the system.
- The time taken on the operation is reported 
	automatically, i.e., time reported on the operation is calculated and 
	transferred to the work order as a time report line performed by you (i.e., 
	the employee connected to your user).
Window
Work Order Operation 
List
Related Window Descriptions
Work Order Operation List 
Procedure
	- Open the Work Order Operation List 
	window.
- Select the Show Only Clocked In Operations 
	check box.
- Locate the necessary operation line.
- Click the Clock Out button found on the 
	button bar or right-click on the operation line and then click Clock Out.
- The Clock Out dialog box opens.
- In the Stop Time field, enter the time to 
	clock out, if it is different from the system date.
- Click OK.
- Observe the clocking data in the Clockings tab.