This activity is used to define the operation that is planned to utilize the material.
The work order operations must be defined prior to the registering of required material if the material should/must be connected to operations.
The material line will be linked to a specific operation.
Report In
Work Order
Work Order Execution 
Logic
Report In Work Order  
Report
In Work Order/Material 
Work Order Execution Logic 
Work Order Execution Logic/Materials 
Use the following procedure to connect to operation: