Connect Work Order
Explanation
Use this activity to connect one or several existing work
order to a
parent work order. 
Prerequisites
Before the work order is connected to the parent
work order, the following must have been
completed: 
  - The parent work order must be displayed in 
	Structure for Work
    Order.
- The work order/orders to be connected, must
    have been created and prepared.
System Effects
As a result of this activity, a work order structure is
created. All work orders connected to a parent work order have to be
completed before the parent work order status is changed to 'Finished'.
Window
Prepare Work Order
Related Window Descriptions
Prepare
Work Order
Procedure
Use the following procedure to connect a work order to a parent work order:
  - In 
	Prepare Work Order, find the parent work order, and use
    the Structure operation. 
- In 
	Structure for Work Order, use
    the New function in the lower part of the window.
- In the WO No. field, use List of Values to
    select the work order that is to be connected. 
- Save the information.