Enter Purchase Requisition Header
Explanation
Entering purchase requisitions is a preliminary step in creating purchase orders and
can be considered a proposal to the buyer or coordinator for what is needed. Anyone
who is entered as a requisitioner can create a requisition (a purchase
order, by contrast, can only be issued by authorized personnel). Requisitions
are also used to match supplier invoices.
A purchase requisition is built in two levels: a requisition header and
one or several requisition lines. Use this activity to create a requisition header for
an inventory part (including external maintenance and repair
services), a non-inventory part, and external craft that is needed for a work order.
The requisition number is assigned by the system when
you save the requisition. You cannot manually enter a
requisition number.
The Create Request for Quotation check box in the Work Order Tender box is 
used when inviting business-to-business contractors to tender on the work order 
via the B2B web client. If this check box is selected, a request for quotation 
is automatically created and released when a part or no-part line is released 
for this requisition. There can be only one requisition header with this check 
box selected for a given work order and there can be only one requisition line 
(either a part or a no part requisition line) on such a requisition. You can 
still enter multiple requisition headers with multiple requisition lines on the 
same work order but on these requisition headers the Create Request for 
Quotation check box can not be selected. These requisitions are not added to 
the request for quotation created via the work order tender flow.
Prerequisites
  - The requisitioner must have been entered on the  
	Requisitioners
    tab of the  Procurement Basic Data 
	window.
- The current work order must have been
    retrieved in the window header.
- In order to invite tenders for a work order, a coordinator must be 
	entered in the  
	Prepare Work Order/CO Information 
	tab. 
System Effects
As a result of this activity, a purchase requisition header with Planned status is
created.
Windows
Prepare Work Order
 
Work Order Execution 
Logic
Related Window Descriptions
Prepare Work Order
Prepare
Work Order/Requisitions 
Work Order Execution Logic 
Work Order Execution Logic/Requisitions
Procedure
  - Open the  
	Prepare Work Order
    window or the Work Order Execution Logic 
	window and query for the applicable work order number.
- Click the 
	Requisitions tab and create
    a new record.
- In the  Requisitioner field, enter the applicable requisitioner or
    select one from the List of Values.
- The  Site field shows the user's default site.
- Today's date is automatically displayed in the  Requisition Date field.
- For items to be sent out for external service,
    select the External Service  check box at the time of creating 
	requisition header. This automatically assigns
    order code 6 (External Service Order) to the purchase requisition. After 
	saving the requisition header you cannot select the checkbox, still you can 
	change order code manually.  If the order code is 6 (External Service 
	Order) you need to enter an external service type on the 
	Part Requisition Lines
    tab when you complete the purchase requisition line.
- In order to invite contractors to tender on the work 
	order, select the Create Request for 
	Quotation check box, enter a date in the Latest Reply Date 
	field and select a value in the Approved Contractor List field.
	
- Save the record. A requisition number is automatically assigned by the
    system and is shown in the Requisition No
    field. Note: The requisition header must be saved before
    any requisition lines can be entered.
- Once saved, the
    requisition header has Planned status.
- If you want to enter another requisition header for the same work order,
    create a new record and enter the required
    information.
- Save the record.