Un-Reserve/Un-Reserve All/Un-Reserve All Material Lines
Explanation
These activities are used to un-reserve material for the 
specified order number.
Prerequisites
  -  	Material lines on the order number have to be reserved.
System Effects
As a result of this activity, lines that are reserved will be unreserved.
Window
Prepare Work Order
Related Window Descriptions
Prepare Work Order 
Prepare Work Order/Materials
Procedure
Alternative 1: Automatic Reservation
  - Open the 
	Prepare Work Order window and
    click the 
	 Materials tab. 
- Right-click on the header and select the Unreserve All Material Lines option.
- All reserved material lines will be un-reserved.
 
Alternative 2: Automatic Reservation
  - Open the 
	Prepare Work Order window and
    click the 
	 Materials tab. 
- Right-click on the selected the line(s) and select the Unreserve All option.
- The reservations for the selected lines will be 
	un-reserved.
 
Alternative 3: Automatic Reservation
  - Open the 
	Prepare Work Order window and
    click the 
	 Materials tab. 
- Right-click on the selected the line and select the Unreserve option.
- In the dialog box, enter the quantity that should be 
	un-reserved.