Add Structure Component
Explanation
This activity 
is used to add a component to a multilevel structure during the multilevel repair 
process.
Prerequisites
Multilevel repair 
shop order should exist with the parent part in the Reserved or Issued state.
System 
Effects
As a result of 
this activity, the changes done to the component is written to the repair 
history. New components added are copied to the
Shop order/Material 
tab. When receiving the repair shop order, a new as-built structure is created 
with the changes done.
Window
Shop Order
Related 
Window Descriptions
Component Replacement Details
Procedure
	- 
	Open the 
	Shop Order 
	window 
	and query for your multilevel repair shop order.
- 
	Make sure that the state 
	of the parent material line is Reserved or Issued.
- 
	Open the 
	Multilevel Repair Structure tab.
- 
	Select the top part from 
	the graphical tree structure, right click and then click Expand Descendents.
- 
	Select the revision node 
	of the parent part to which you want to add a component.
- 
	Right-click and then click 
	Component Replacement to open the  Component Replacement Details dialog 
	box 
	with the parent part you selected in the header as the parent part.
- 
	Click Add to 
	create a new record in the table. Since you are adding a new component, 
	Repair Action will be defaulted to Add and the original component data will be 
	displayed as null in the added record. You have to enter values related to 
	the new component in the replace component fields.  
- 
	In the Replace 
	Part No field, enter the part number you want to add from the List of 
	Values. 
- 
	Enter the required 
	component quantity either in the Replace Quantity or Replace QPA field. Here you 
	can see the suggested component quantity in
	the  Calc Comp 
	Qty field. 
- 
	Enter the repair reason 
	for the structure changes from the List of Values. 
	
- 
	Click Apply or OK.
Note: 
If the component you are 
adding is serial-tracked, then the quantity should always be 1. You may add 
multiple lines for each serial component. 
You can select 
Exclude from As-Built structure, If you do not want to add the new 
component to the new as-built structure which is created when receiving the 
multilevel repair shop order.