Use this tab window to view additional information about part revisions. You can also update certain fields: Material Cost, Work Cost, Work Hour, Lead Time, Assumed Cost, and Assumed Lead Time. If the IFS Inventory module is installed, the Material Cost, Work Cost, Work Hour, and Lead Time fields can also be updated by running the menu option Update Cost and Lead Time. Use the menu option Calculate Part to update the Calc. Cost, Work Cost, and Work Hour fields for all levels in the part structure. Create and Remove are not allowed here.
Supply Product Structure Information
Fulfill 
        Document Requirement
Create 
        New Revision
Copy 
        Structure/Document Survey/Technical Specification
Replace 
        Revision
Set 
        Develop Level
Activate 
        Product Structure
Release 
        Part Revision
Set 
        Part Revision Obsolete
Roll 
        Up Cost Calculation
Update 
        Cost and Lead time from Inventory
View 
        Product Structure Graphically
Manufacturing 
        Standards Product Structure