Use this tab window to make a new (second or subsequent) revision whenever needed. A first revision must always be created from Engineering Parts or Part/Engineering/Part Detail. Each old revision with its structure, journal, document survey, etc., is available for tracing and analyzing as long as it is not deleted. To connect documents to a part or see documents connected to a selected part, click the Connected Objects toolbar option.
Create Part
  Revision
Design Product
  Structure
Evaluate Product
  Range
Release Part
  Revision
Fulfill
      Document Requirement
Create
      New Revision
Copy
      Structure/Document Survey/Characteristics
Replace
      Revision
Set Develop
      Level
Activate
      Product Structure
Release
      Part Revision
Set
      Part Revision Obsolete
Roll
      Up Cost Calculation
Update
      Cost and Lead time from Inventory
View
      Product Structure Graphically
Manufacturing Standards
      Product Structure