Use this tab to view the results after a resource capacity calculation. Load and capacity information is shown for each resource group and period. The most important results are: Load Hours, Normal Capacity, Maximum Capacity and Utilization.
Forecast
  and Assign Resources
Plan
  and Assign Resources