Define Item Code 
Explanation
A deferral item holds the maximum
delays in days and/or in an operational parameter. If the deferral list code
requires a list item definition, item codes with a maximum delay must be defined. If the default maximum delays have been defined on the 
Categories 
tab, you can
associate an item code with a category. Otherwise you must manually specify the 
maximum delay in days and/or operational parameter. The items codes can then be associated with the appropriate part 
revisions.  
Prerequisites
System Effects
Window
Deferral
Definition
Related Window Descriptions
Deferral
Definition/Items
Procedure
  - Open the Deferral Definition window. 
- Query for the desired deferral list code. 
- Click the 
	Items
    tab, and create a new record. 
- Enter the ID for the item in the Deferral
    Item Code field, and enter a description in the Deferral Item
    Description field. 
- If you have defined default maximum delays in the
    
	
Categories 
	tab, you can now enter a deferral category code, or use the List 
  of Values
    to select a deferral category. The Deferral Days, Deferral Value, and Deferral
    Oper Param  fields will be copied from the selected category.
     
- If you did not select a deferral category code, you
    can manually define the allowed deferral time periods. Enter a number of
    days in the Deferral Days  field, and/or enter a deferral value and
    a corresponding deferral operational parameter. 
- Save.